Piling homes have long been the foundation of resilience along North Carolina’s shifting coastlines. At Riverside Builders, we specialize in elevated structures engineered for flood zones, hurricane conditions, and legacy protection. 🌊 Flood Resilience: Our piling foundations elevate homes above rising waters, meeting FEMA standards and reducing long-term risk. 💨 Storm Durability: Deep-set pilings resist erosion and storm surge, offering structural integrity where slab foundations fail. 🧱 Engineered for Coastal Soil: Eastern NC’s high-water tables and sandy terrain demand deeper, friction-based support systems. 🏡 Investor Appeal: Elevated homes offer better views, lower insurance costs, and stronger ROI for Airbnb hosts and second-home buyers. 🛠️ Modular Compatibility: Our piling systems integrate seamlessly with off-site modular builds, accelerating timelines without compromising safety
You can explore your specific build site to discover flood zone by clicking the button above..

Residential and Vacation Homes for Real People in Mind.
AFFORDABLE
EFFICIENT
CUSTOMIZED
Building near the shoreline? Let us help tailor a PILING - BASED PACKAGE that includes elevated foundations, flood-resistant materials, and marine-grade finishes. Most of our foundations can be completed in a week. The planning, engineered piling plan, and layout usually a little longer. Most of our foundations are built with 8" x 8" treated wood pilings. Girders can be treated 2" x 12" lumber or engineered laminated beams (LVL's). All connectors are hot - dipped galvanized bolts, nails, and straps. Site built homes on pilings require about the same amount of time to build. Modular homes can be set on an elevated foundation and completed in about 4 to 6 weeks. One of the major cost differences for a raised home is the decks and steps. They are higher and usually larger.



